 |
Keith Brown - Honeywell |
DBP00305 - Smartphone Commissioning - FCU & VAV Controllers |
 |
Michael McCarron - Byrne Civil Solutions |
DBP00304 - Spill Response |
 |
Ben Burgess - Sodexo |
DBP00300 - Best Practice for Rubber Bellows Maintenance |
 |
David Williams - End Systems Ltd |
DBP00299 - The Lighthouse Club |
 |
Kevin Coker - DCE Datacoms |
DBP00297 - Data Cabinet Layout |
 |
Matt Makin - ADT |
DBP00296 - 3OTech Fire Detector |
 |
Nikki Rowen - KDC Contractors |
DBP00295 - Demolition to Reduce Work From Height |
 |
Stuart Gatwood - ACS Construction |
DBP00290 - High Spec Dumper Trucks |
 |
Jane King - Altrad |
DBP00288 - Zero Carbon Satellite Welfare Cabins |
 |
Ian McDonald - Overbury |
DBP00286 - Peco Lift Side Guards |
 |
Ian McDonald - Overbury |
DBP00285 - Plaster Board Trolley |
 |
Ondrej Stepan - Wilson James |
DBP00282 - Temporary Floor Protection and Walkways |
 |
Stuart Gatwood - ACS Construction |
DBP00279 - Gulley Hook Lifter |
 |
Alan Garratt - End Systems |
DBP00275 - The Balometer Stand - Reducing Working at Height |
 |
Nikki Rowen - KDC Contractors |
DBP00274 - Safe Access to Wagons |
 |
Andrew Hill - CAH Safety |
DBP00273 - Tools Falling From Height |
 |
Chris Sorenson - Overbury |
DBP00269 - Noise Awareness in Construction |
 |
Jim Zhou - Lend Lease |
DBP00264 - Additions to Steelwork for a Safer Project |
 |
Paul Bussey - DIOHAS |
DBP00251 - External Refurb of Unusual Structures |
 |
Mike Jones - Oasis Services |
DBP00245 - Revolutionary Aluminium Pipeline Connection System |
 |
Jim Zhou - Lend Lease |
DBP00242 - Emergency Call |
 |
Leigh Renshaw |
DBP00241 - External Envelope Protection |
 |
Paul Bussey - Scott Brownrigg |
DBP00240 - Prefabrication & Offsite Manufacture - Case Study |
 |
Graham Sex - Austin Co. |
DBP00239 - Simple Cleanroom Edge Protection |
 |
Aranzazu Leru - PM Group |
DBP00238 - Design Scaffold Protection over a Live Building |
 |
Steve Youngman - PM Group |
DBP00237 - Workable Space - Importance of Visual Representation |
 |
Paul Bussey - Scott Brownrigg |
DBP00236 - Plasterboard Handling - Contract Design Stage |
 |
Steve Youngman - PM Group |
DBP00235 - Universal Safety Signage |
 |
Aranzazu Lera - PM Group |
DBP00234 - Design Solution for Unloading & Loading Skips |
 |
Paul Bussey - Scott Brownrigg |
DBP00232 - Heavy Masonry Units - Contract Design Stage |
 |
Robert Lloyd |
DBP00231 - CoolZone Ceiling Tiles |
 |
Robert Lloyd |
DBP00230 - Flexible Porous Paving |
 |
Matthew King - Cockram Construction |
DBP00227 - Steel Equipment Foundations |
 |
Mark Edwards |
DBP00224 - Benefits of Modular Construction |
 |
DIOHAS |
DBP00213 - Building the London Eye |
 |
DIOHAS |
DBP00212 - Demolition of Unusual Structures |
 |
Mark Porter |
DBP00209 - Hinged Site Lighting Brackets |
 |
Arup / HSE |
DBP00208 - Unusual Steelwork Erection |
 |
Arup / HSE |
DBP00207 - Reducing Construction Site Fire Risks |
 |
Scott Brownrigg / HSE |
DBP00206 - Glass Roof Cleaning & Maintenance |
 |
Scott Brownrigg |
DBP00205 - Fragile Roof Lights |
 |
Scott Brownrigg |
DBP00203 - Handling Heavy Glass Screens |
 |
Arup / HSE |
DBP00202 - Re-Bar - Design to Reduce Hazards |
 |
Tony Murphy - Hutchinson Eng |
DBP00196 - Tethered Tools |
 |
Arup / HSE |
DBP00195 - Access Through Suspended Ceilings |
 |
Arup / HSE |
DBP00194 - Concrete Construction - Reducing Health Risks |
 |
Steve Mannion - ADT |
DBP00193 - Beam Detection Installation Best Practice |
 |
Tony Warburton - Red Architectural |
DBP00192 - Large Span Composite Roofing Sheets |
 |
Mike Jones - Oasis Services |
DBP00191 - Refrigerent Recovery and Evacuation Point |
 |
Paul Bussey - Scott Brownrigg |
DBP00186 - Dust Avoidance |
 |
Scott Brownrigg / HSE |
DBP00185 - Managing Internal Riser Ducts |
 |
Scott Brownrigg / HSE |
DBP00184 - Design for Lighting Maintenance Access |
 |
Arup / HSE |
DBP00182 - Sequencing and Design Considerations for Demolition |
 |
Arup / HSE |
DBP00181 - Improving Maintainability of Power Distribution Units |
 |
Arup / HSE |
DBP00180 - Extract Duct Maintenance � Design to Improve Access |
 |
Arup / HSE |
DBP00179 - Critical Risks - A Proposed potential Demolition Sequence |
 |
Arup / HSE |
DBP00178 - Facade Installation - Specialist Access Equipment Design |
 |
Arup / HSE |
DBP00177 - Design Tips for Improved piling Safety |
 |
Arup / HSE |
DBP00176 - Pre-installed Supports for M&E Services |
 |
ARUP / HSE |
DBP00175 - Mock Ups to Verify a Complex Structure |
 |
Mike Jones - Oasis Services |
DBP00171 - Co2 Air Quality Sensors |
 |
Kat McCartney - KDC Contractors |
DBP00170 - Platform Access System |
 |
Leighton Kirk - Derry Building Services |
DBP00168 - Laboratory Ceiling Pods |
 |
Gary Gallagher - Turner Access |
DBP00163 - Betaguard Scaffold |
 |
Tony Leach |
DBP00161 - Fermacell Board vs Traditional Methods |
 |
Tony Leach |
DBP00160 - Reducing Heat Build up in Ceiling Voids |
 |
Paul Bussey - Scott Brownrigg |
DBP00159 - Identifying Risks with Symbols |
 |
Steve Mannion - ADT |
DBP00153 - Installation & Testing of Fire Alarms |
 |
P Morgan - Henshaws |
DBP00149 - On Site Waste Segregation |
 |
John Hackett - Interserve |
DBP00146 - Boss X3 Micro Powered Platform |
 |
Andrew Malloy - Compass Energy Consulting Engineers |
DBP00141 - Grey Water Recycling |
 |
Gary Mason - Tension Control Bolts Ltd |
DBP00134 - Tension Control Bolts |
 |
Gary Lewis - Killelea |
DBP00128 - Handrails Designed into Staircases |
 |
Mike Keighery - Temple Somerville (P&D) Ltd |
DBP00127 - Slip Grip Stair Treads |
 |
Higgins LCP Ltd |
DBP00120 - Reduced Pressure Zone Valve |
 |
N.Conners - Carillion |
DBP00109 - Landing Steel Columns |
 |
Matthew Ward - Cape |
DBP00100 - Mini Personnel Access Lift |
 |
Higgins LCP Ltd |
DBP00094 - Water Tanks (storage cisterns) & Legionella Risk Assessments |
 |
Higgins LCP Ltd |
DBP00093 - Hot Water Cylinders for Legionella Risk Assessments |
 |
Tony Whitworth - FK Roofing Services |
DBP00089 - Self Erecting Crane |
 |
Higgins LCP Ltd |
DBP00088 - Urinal Flushing & Water Saving |
 |
Sara Sutton |
DBP00085 - Suspended Ceiling Damage Prevention |
 |
Sara Sutton |
DBP00084 - Dry Lining of Brick and Block Walls |