Page 1 of 1

04 - Modular Lifting

Posted: Wed Sep 03, 2008 9:01 am
by cross
http://www.dbp.org.uk/cs/DBP00131.pdf

A non modular design can be converted for modular construction with the correct safeguards.

This case study is a reference to the original case study Lifting Frame for Modular Pipe racks.