Postby Chris Achilles » Tue Mar 07, 2017 7:12 am

An interesting article about the benefits of Modular Construction and it's roots in the Oil and Gas industry.

http://www.constructionmanagermagazine. ... sch7edule/

We have just shipped 4 modules to Rosyth (one was 5.5m x 12m x 4.3m and weighed 28 Tonne) so we are doing our bit :D


Thanks to Brian Street for the link.